Membrane and Water Treatment

Volume 4, Number 3, 2013, pages 175-189

DOI: 10.12989/mwt.2013.4.3.175

Comparison study on membrane fouling by various sludge fractions with long solid retention time in membrane bioreactor

Darren Delai Sun , Shushu Liu

Abstract

A membrane bioreactor (MBR) with sludge retention time (SRT) of 300 days was maintained for over 2 years. Polypropylene microfiltration (MF) membrane with pore size of 0.2

Key Words

long SRT; MBR; membrane fouling; solutes; suspended solids

Address

PDF Viewer

Preview uses the same access rules as Full Text PDF (subscription, purchase, or open access).

Loading… Download PDF