Geomechanics and Engineering

Volume 39, Number 1, 2024, pages 027-41

DOI: 10.12989/gae.2024.39.1.027

Estimation of tunnel boring machine penetration rate: Application of long-short-term memory and meta-heuristic optimization algorithms

Mengran Xu , Arsalan Mahmoodzadeh , Abdelkader Mabrouk , Hawkar Hashim Ibrahim , Yasser Alashker , Adil Hussein Mohammed

Abstract

Accurately estimating the performance of tunnel boring machines (TBMs) is crucial for mitigating the substantial financial risks and complexities associated with tunnel construction. Machine learning (ML) techniques have emerged as powerful tools for predicting non-linear time series data. In this research, six advanced meta-heuristic optimization algorithms based on long short-term memory (LSTM) networks were developed to predict TBM penetration rate (TBM-PR). The study utilized 1125 datasets, partitioned into 20% for testing, 70% for training, and 10% for validation, incorporating six key input parameters influencing TBM-PR. The performances of these LSTM-based models were rigorously compared using a suite of statistical evaluation metrics. The results underscored the profound impact of optimization algorithms on prediction accuracy. Among the models tested, the LSTM optimized by the particle swarm optimization (PSO) algorithm emerged as the most robust predictor of TBM-PR. Sensitivity analysis further revealed that the orientation of discontinuities, specifically the alpha angle (a), exerted the greatest influence on the model's predictions. This research is significant in that it addresses critical concerns of TBM manufacturers and operators, offering a reliable predictive tool adaptable to varying geological conditions.

Key Words

long-short-term memory; machine learning; machine penetration rate; metaheuristic optimization; sensitivity analysis; tunnel boring

Address

PDF Viewer

Preview is limited to the first 3 pages. Sign in to access the full PDF.

Loading…