Geomechanics and Engineering

Volume 19, Number 2, 2019, pages 115-126

DOI: 10.12989/gae.2019.19.2.115

Field test of the long-term settlement for the post-grouted pile in the deep-thick soft soil

Jin-Feng Zou , Tao Yang , Dong-ping Deng

Abstract

The long-term settlement characteristics for the cast-in-place bored pile in the deep-thick soft soil are investigated by post-grouting field tests. Six cast-in-place bored engineering piles and three cast-in-place bored test piles are installed to study the long-term settlement characteristics. Three post-grouting methods (i.e., post-tip-grouting, post-side-grouting, and tip and side post-grouting) are designed and carried out by field tests. Results of the local test show that decreased settlements for the post-side-grouted pile, the post-tip-grouted pile and the tip and side post-grouted pile are 22.2%~25.8%, 30.10%~35.98% and 32.40%~35.50%, respectively, compared with non-grouted piles. The side friction resistance for non-grouted piles, post-side-grouted pile, post-tip-grouted pile and the tip and side post-grouted pile undertakes 89.6~91.3%, 94.6%, 92.4%~93.0%, 95.7% of the total loading, respectively. At last, the parameters back analysis method and numerical calculation are adopted to predict the long-term settlement characteristics of the cast-in-place bored pile in the deep-thick soft soil. Determined Bulk modulus (K) and a creep parameter (Ks) are used for the back analysis of the long-term settlement of the post-grouted pile. The settlement difference between the back analysis and the measurement data is about 1.11%-7.41%. Long-term settlement of the post-grouted piles are predicted by the back analysis method, and the predicted results show that the settlement of the post-grouted pile are less than 6 mm and will be stable in 30 days.

Key Words

post-grouting local test; long-term settlement; deep-thick soft soil; cast-in-place bored pile; back analysis method

Address

Jin-Feng Zou, Tao Yang and Dong-ping Deng: School of Civil Engineering, Central South University, No.22, Shaoshan South Road,Central South University Railway Campus, Changsha, Hunan Province, People\'s Republic of China

PDF Viewer

Preview uses the same access rules as Full Text PDF (subscription, purchase, or open access).

Loading… Download PDF