An innovative geometry control method for short-line match precast segmental bridges
Xuzheng Liu,Huibing Xu,Jianyang Yu,Wei Quan
Abstract
The occurrence of unexpected horizontal offset in the instrument or target will result in accumulated horizontal deviation in segment alignment with traditional short-line match method. A geometry control method, the four-point method, is developed for precast segmental bridges to avoid the influences of unexpected horizontal offset. The concept of the four-point method is elucidated. Furthermore, the detailed instruments and instructions are introduced. Finally, the four-point method is validated through a practical engineering application. According to the survey data, after short-line match precast construction, the vertical deviations on both sides vary between -5 mm and 5 mm in almost all segments, and the horizontal deviations vary between -4 mm and 4 mm in all segments. Without on-site adjustment, the maximum vertical and horizontal closure gaps are 12.3 and 26.1 mm, respectively. The four-point method is suggested to alleviate the issues associated with relatively poor soil conditions in casting yard.